Pre-production: The Production schedule –
weekdays:
Location:
College entrance: shooting scenes 1&2.
Streets shooting scenes: 3, 9-17, 21-28 and 36.
Contacts-Crew: producers Zeeshan Wasim (07783719096) &
Humaira (07904914133).
Actors: Tariq (playing the role of Alishas boyfriend in the film): 07939539951
Abhay (playing the role of the bully in the film): 07940174808
Ismael (playing the role of a Kevin in the film): 07769226158
Wareece (playing the role of Alisha in the film):07507130451
Abhay (playing the role of the bully in the film): 07940174808
Ismael (playing the role of a Kevin in the film): 07769226158
Wareece (playing the role of Alisha in the film):07507130451
Unit
transport: walking to a suitable
area.
Equipment: HD camera, tripod and
extra spare battery.
Props:
phone which actors should have
if not then provide them with one.
Times: mid-day 12:00pm. Allow
15mins to check everyone knows what they are doing and if not just brief them of
the scenes which will be taking place as well as making sure everyone has read
their part of the script. Ask everyone to have lunch before we begin filming as
there will be no major breaks, helping to ensure
continuity.
Filming schedule:
12.00pm
– all actors on scene making sure they know what scenes are taking place and
when.
12:10pm
- College scene 1&2
Walk
to suitable area on the streets to film the following
scenes:
12:15pm
– shoot scenes 3 and 9-17.
12:30pm
– shoot scenes 21-28.
12:45pm-1:15 –
break.
1:15pm
– shoot scene no 36.
1:25pm
– check filming and make sure all scenes are correct before leaving.
No comments:
Post a Comment